Sustainability and green
OPS-project (Public-Private-Cooperation). The project consists of 22 km new road, 5 km road to be repaired, 10 km tunnels, 12 bridges (the biggest approx 240 m long) and maintenance.
The contract lasts for 27 years which includes two years of development and 25 working years of road maintenance.
- Bridges: 4 Main bridges - total length 618 m,
- 5 Passage bridges - total length 216 m, 1 Environment-culvert - total length 168 m.
- Tunnels: 6 tunnels T9,5, at a total length of 9 940 m (706 000 fm3)
- Trenching = 665 000 fm3, Blasting = 1 100 000 fm3,
- Asphalt works = 80 000 tons
This is the first project of this kind in the communication/transport-section in Norway.